Read this case studyCADS was approached by McCue Crafted Fit to carry out measured surveys and drawings for the branches allocated to them for refurbishment by their client Santander. The project timescale meant that measured surveys had to be carried out simultaneously in all the branches assigned to McCue. CAD drawings were also required so that McCue’s design team and contractors had reliable and dimensionally accurate building data to work from.
In the absence of up-to-date estate records, the team surveyed each branch within McCue’s refurbishment programme and produced CAD drawings to reflect the full extent of the property and the as-existing layout of the branch, including fixtures and fittings.
The final drawings confirmed that the proposed refurbishment design could be implemented with confidence, avoiding delays that can occur because of inaccurate information.
Following the success of the data collected for McCue, the CAD’s surveying team was asked to supply survey measurements by other contractors working on the refurbishment including GB Farrer, Thomas Johnstone Ltd, C W Duke, Islwyn Pugh Construction and Cordery Build. This process helped standardise the use of data across the project.
Find out how our trusted team of surveyors can help you get reliable as-built survey data, quickly and accurately from multiple sites across the UK.
And you can gain the peace of mind that other clients like Santander, Polo Ralph Lauren, Watches of Switzerland Group and Morrisons, are enjoying.
Learn more about CADS as-built surveysCADS provided an accurate survey of each building prior to the design team producing any schemes, or scoping meetings taking place, giving us confidence that our global design could be achieved in each location at a much earlier stage in the programme.
CADS surveyed all branches within the whole refurbishment programme, collecting the data to build a library of accurate and reliable building survey information on which the contractors could rely.
Santander UK was historically three separate brands and with a nationwide refurbishment programme we needed to find ways to be more efficient with our delivery and update our drawing database across our portfolio of properties.
CADS provided an accurate survey of each building prior to the design team producing any schemes, or scoping meetings taking place. This gave us the confidence that our global design could be achieved in each location at a much earlier stage in the programme, reducing the number of site visits and drawing revisions. This had the benefit of saving on time and cost.
Talk to our trusted team about the as-built data you need for your next refurbishment project. Simply fill in the form and one of our survey experts will be in touch.
Acting as surveying partner supporting PRL's development of their European concessions, CADS undertook 255 surveys in 25 European countries in 18 months
Read this case studySurveying project providing information for a large UK utility provider's energy efficiency upgrade programme, helping the UK's first major transport operator switch to 100% renewable energy.
Read this case studyCADS supported this ambitious programme to comprehensively refurbish and rebrand 60,000 sqm, by simultaneously surveying six hotels in six weeks.
Read this case study